Assessment Year | 2003 |
---|---|
Principal Product | Brake Hoses |
NAICS | 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
89,000
ft2
|
Annual Production | 15,100,000
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,903 | 3,612,000 |
kWh
|
$0.033 |
Electricity Demand | $74,364 | 8,513 |
kW-mo/yr
|
$8.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,953 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $10,395 | - |
$10,395
192,500
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,817 | $12,292 |
$2,324
70,411
kWh
|
$1,493
-
kW-mo/yr
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $14,183 | $11,058 |
$14,183
262,654
kWh
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,810 | - |
$2,505
46,381
kWh
|
- | $205 | $1,100 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,031 | - |
$2,031
37,606
kWh
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $6,039 | $5,141 |
$6,039
111,841
kWh
|
- | - | - | |
07 | 4.424: Improve space comfort conditioning | $3,900 | $4,000 | - | - | $3,900 | - | |
TOTAL RECOMMENDED | $44,175 | $32,491 |
$37,477
721,393
kWh
|
$1,493
-
kW-mo/yr
|
$4,105 | $1,100 | ||
TOTAL IMPLEMENTED | $23,953 | $16,292 |
$17,255
346,898
kWh
|
$1,493
-
kW-mo/yr
|
$4,105 | $1,100 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs