ITAC Assessment: UF0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Brake Hoses
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 89,000
ft2
Annual Production 15,100,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,903 3,612,000
kWh
Electricity Demand $74,364 8,513
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $10,395 - $10,395
192,500
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,817 $12,292 $2,324
70,411
kWh
$1,493
-
kW-mo/yr
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $14,183 $11,058 $14,183
262,654
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,810 - $2,505
46,381
kWh
- $205 $1,100
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,031 - $2,031
37,606
kWh
- - -
06 2.7111: Reduce illumination to minimum necessary levels $6,039 $5,141 $6,039
111,841
kWh
- - -
07 4.424: Improve space comfort conditioning $3,900 $4,000 - - $3,900 -
TOTAL RECOMMENDED $44,175 $32,491 $37,477
721,393
kWh
$1,493
-
kW-mo/yr
$4,105 $1,100
TOTAL IMPLEMENTED $23,953 $16,292 $17,255
346,898
kWh
$1,493
-
kW-mo/yr
$4,105 $1,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs