Assessment Year | 2010 |
---|---|
Principal Product | Fabricated steel buildings |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
195,000
ft2
|
Annual Production | 42,000,000
lb
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,695 | 1,987,918 |
kWh
|
$0.036 |
Electricity Demand | $106,186 | 7,335 |
kW-mo/yr
|
$14.48 |
Electricity Fees | $10,476 | - |
|
- |
Natural Gas | $21,004 | 1,706 |
MMBtu
|
$12.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,316 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,381 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $4,526 | $6,090 | - | - |
$4,526
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $420 | $200 |
$493
14,502
kWh
|
$567
-
kW-mo/yr
|
- | $(-400.0) | $(-240.0) | |
03 | 2.7135: Install occupancy sensors | $435 | $1,890 |
$435
12,809
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,935 | $40 |
$3,398
100,000
kWh
|
$4,222
-
kW-mo/yr
|
- | - | $(-2,685.0) | |
TOTAL RECOMMENDED | $10,316 | $8,220 |
$4,326
127,311
kWh
|
$4,789
-
kW-mo/yr
|
$4,526
-
MMBtu
|
$(-400.0) | $(-2,925.0) | ||
TOTAL IMPLEMENTED | $5,381 | $8,180 |
$928
27,311
kWh
|
$567
-
kW-mo/yr
|
$4,526
-
MMBtu
|
$(-400.0) | $(-240.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs