ITAC Assessment: NC0404
ITAC logo
ITAC Assessment: NC0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fabricated steel buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 195,000
ft2
Annual Production 42,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,695 1,987,918
kWh
Electricity Demand $106,186 7,335
kW-mo/yr
Electricity Fees $10,476 -
Natural Gas $21,004 1,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $4,526 $6,090 - - $4,526
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $420 $200 $493
14,502
kWh
$567
-
kW-mo/yr
- $(-400.0) $(-240.0)
03 2.7135: Install occupancy sensors $435 $1,890 $435
12,809
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,935 $40 $3,398
100,000
kWh
$4,222
-
kW-mo/yr
- - $(-2,685.0)
TOTAL RECOMMENDED $10,316 $8,220 $4,326
127,311
kWh
$4,789
-
kW-mo/yr
$4,526
-
MMBtu
$(-400.0) $(-2,925.0)
TOTAL IMPLEMENTED $5,381 $8,180 $928
27,311
kWh
$567
-
kW-mo/yr
$4,526
-
MMBtu
$(-400.0) $(-240.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs