Assessment Year | 1998 |
---|---|
Principal Product | Spiral and Oval Duct Work Products |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
30,000
ft2
|
Annual Production | 58,256
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,733 | 264,654 |
kWh
|
$0.078 |
Electricity Fees | $1,265 | - |
|
- |
Natural Gas | $8,108 | 1,076 |
MMBtu
|
$7.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,719 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,266 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 4.611: Begin a practice of predictive / preventative maintenance | $16,288 | $3,700 | - | - | $16,288 | |
02 | 4.432: Cross-train personnel to avoid lost time | $14,171 | $25,000 | - | - | $14,171 | |
03 | 4.711: Initiate a total quality management program | $12,629 | $30,000 | - | - | $12,629 | |
04 | 2.7229: Air condition only space necessary | $3,000 | $5,000 | - | - | $3,000 | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $2,250 | $5,000 | - | - | $2,250 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $149 | $376 |
$149
1,758
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $73 | $108 |
$73
879
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $760 | $40 |
$760
9,086
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $502 | $46 |
$502
6,155
kWh
|
- | - | |
10 | 2.4131: Size electric motors for peak operating efficiency | $748 | $735 |
$748
9,086
kWh
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $180 | - |
$180
2,052
kWh
|
- | - | |
12 | 3.7196: Use re-usable filters | $7,769 | $2,283 | - |
$7,769
-
lb
|
- | |
13 | 3.1191: Change procedures / equipment / operating conditions | $1,200 | $747 | - |
$1,200
-
lb
|
- | |
TOTAL RECOMMENDED | $59,719 | $73,035 |
$2,412
29,016
kWh
|
$8,969
-
lb
|
$48,338 | ||
TOTAL IMPLEMENTED | $46,266 | $64,435 |
$928
11,138
kWh
|
- | $45,338 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs