ITAC Assessment: UM0267
ITAC logo
ITAC Assessment: UM0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Rubber Gaskets
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 105,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,476 5,289,455
kWh
Electricity Demand $129,062 13,927
kW-mo/yr
Electricity Fees $4,789 -
Natural Gas $54,686 6,741
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.5311: Recover and reuse waste material $27,320 $10,000 - - $(-1,379.0)
-
MMBtu
- $19,500 $9,199
-
Tgal
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,684 $2,400 $26,682
857,929
kWh
$12,746
-
kW-mo/yr
$(-23,744.0)
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,675 $20,137 $9,731
312,902
kWh
$3,944
-
kW-mo/yr
- - - -
04 2.3212: Optimize plant power factor $11,902 $21,150 - - - $11,902 - -
05 2.4322: Use or replace with energy efficient substitutes $6,938 $2,615 $4,695
150,985
kWh
$2,243
-
kW-mo/yr
- - - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $4,119 $1,300 - - $4,119
-
MMBtu
- - -
07 2.7221: Lower temperature during the winter season and vice-versa $3,390 $200 - - $3,390
-
MMBtu
- - -
08 2.2515: Use optimum thickness insulation $3,274 $1,985 $2,216
71,240
kWh
$1,058
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $711 $736 $711
22,869
kWh
- - - - -
TOTAL RECOMMENDED $87,013 $60,523 $44,035
1,415,925
kWh
$19,991
-
kW-mo/yr
$(-17,614.0)
-
MMBtu
$11,902 $19,500 $9,199
-
Tgal
TOTAL IMPLEMENTED $32,515 $43,902 $14,426
463,887
kWh
$6,187
-
kW-mo/yr
- $11,902 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs