Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,307

matching recommendations
$
$
ARC Equipment control
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0617 #05 Y:2026 Install set-back timers $3,886 $566
AS0617 #02 Y:2026 Utilize controls to operate equipment only when needed $48,164 $4,095
SJ0051 #07 Y:2026 Turn off equipment when not in use $13,400 -
MU0089 #06 Y:2026 Turn off equipment when not in use $1,224 $30
MU0089 #05 Y:2026 Turn off equipment when not in use $118 -
LE0617 #09 Y:2026 Utilize controls to operate equipment only when needed $32,528 $141,920
UL2608 #04 Y:2026 Turn off equipment during breaks, reduce operating time $1,290 -
SU0597 #09 Y:2026 Conserve energy by efficient use of vending machines $1,131 $1,261
SU0596 #02 Y:2026 Conserve energy by efficient use of vending machines $2,112 $1,932
UD1140 #01 Y:2026 Turn off equipment during breaks, reduce operating time $174 -
OK1171 #06 Y:2026 Conserve energy by efficient use of vending machines $846 $1,140
IC0347 #08 Y:2026 Utilize controls to operate equipment only when needed $168 $1,060
MS0472 #06 Y:2026 Turn off equipment when not in use $9,021 -
LE0615 #02 Y:2026 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $3,636 $1,200
NT0067 #05 Y:2026 Turn off equipment when not in use $8,377 $625
MZ1023 #07 Y:2026 Utilize controls to operate equipment only when needed $1,311 $2,140
AS0615 #08 Y:2026 Install set-back timers $246 $890
UL2606 #09 Y:2026 Turn off equipment during breaks, reduce operating time $1,560 -
LT8447 #01 Y:2026 Turn off equipment when not in use $3,158 $1,147
UF0649 #08 Y:2026 Turn off steam / hot water lines leading to space heating units $1,026 $3,500