| Assessment Year | 2026 |
|---|---|
| Principal Product | Metal roof clips |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 87 |
| Plant Area |
128,000
ft2
|
| Annual Production | 30,539,554
pieces
|
| Production Hrs. Annual | 3,672
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $111,667 | 1,254,000 |
kWh
|
$0.089 | |
| Natural Gas | $9,062 | 1,254 |
MMBtu
|
$7.23 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,728 | 172 |
Tgal
|
$21.68 | |
| Water Disposal | $6,884 | 172 |
Tgal
|
$40.02 | |
| TOTAL YEARLY COSTS | $131,341 | ||||
| RECOMMENDED SAVINGS* | $21,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,197 | - |
$7,197
80,866
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,169 | $58 |
$2,169
24,370
kWh
|
- | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $666 | $42 |
$666
7,480
kWh
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $2,767 | $284 |
$2,767
31,090
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $7,040 | $831 |
$7,040
79,103
kWh
|
- | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $1,160 | $1,343 | - |
$1,160
-
MMBtu
|
|
| 07 | 2.7135: Install occupancy sensors | $980 | $2,324 |
$980
11,016
kWh
|
- | |
| TOTAL RECOMMENDED | $21,979 | $4,882 |
$20,819
233,925
kWh
|
$1,160
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs