ITAC Assessment: DL0025
ITAC logo
ITAC Assessment: DL0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Plastics (Pellets)
NAICS 326199: All Other Plastics Product Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 100,000
ft2
Annual Production 1,065
units
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $578,543 4,688,510
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3512: De-energize excess transformer capacity $1,078 - $1,078
8,766
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,976 - $8,976
92,975
kWh
03 2.6218: Turn off equipment when not in use $36,900 - $36,900
300,000
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,600 - $5,600
45,600
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,919 $30,000 $16,919
137,555
kWh
06 2.4224: Upgrade controls on compressors $3,964 - $3,964
32,227
kWh
TOTAL RECOMMENDED $73,437 $30,000 $73,437
617,123
kWh
TOTAL IMPLEMENTED $62,795 $30,000 $62,795
530,530
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs