ITAC Assessment: AS0470
ITAC logo
ITAC Assessment: AS0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Commercial paper rolls
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 500,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 8,136
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,734,842 60,572,760
kWh
Electricity Demand $1,618,249 93,320
kW-mo/yr
Electricity Fees $257,368 -
Natural Gas $2,469,284 476,371
MMBtu
TOTAL YEARLY COSTS $7,079,743
RECOMMENDED SAVINGS* $740,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $740,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $680,774 $3,152,400 $264,614
5,867,285
kWh
$416,160
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $19,947 $40,400 $12,729
282,230
kWh
$7,218
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,843 $10,895 $13,389
296,871
kWh
$6,454
-
kW-mo/yr
-
04 2.2135: Repair and eliminate steam leaks $12,345 $516 - - $12,345
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,823 $3,204 $4,455
98,791
kWh
$3,368
-
kW-mo/yr
-
TOTAL RECOMMENDED $740,732 $3,207,415 $295,187
6,545,177
kWh
$433,200
-
kW-mo/yr
$12,345
-
MMBtu
TOTAL IMPLEMENTED $740,732 $3,207,415 $295,187
6,545,177
kWh
$433,200
-
kW-mo/yr
$12,345
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs