Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FROZEN FRENCH FRIES
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 86
Plant Area
n/a
Annual Production 35,000,000
lb
Production Hrs. Annual 8,064
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,968 4,135,111
kWh
LPG $186,231 43,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $3,046 - $3,046
67,702
kWh
- -
02 2.2511: Insulate bare equipment $2,878 $858 - $2,878
-
MMBtu
-
03 2.2511: Insulate bare equipment $2,704 $1,375 - $2,704
-
MMBtu
-
04 2.2511: Insulate bare equipment $1,853 $1,546 - $1,853
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $125 $114 $125
2,638
kWh
- -
06 2.2621: Modify refrigeration system to operate at a lower pressure $5,439 $4,800 $5,439
120,750
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $696 $845 $340
7,620
kWh
- $356
08 2.2136: Install / repair insulation on steam lines $891 $1,213 - $891
-
MMBtu
-
09 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $19,381 $29,735 - $19,381
-
MMBtu
-
10 2.3212: Optimize plant power factor $1,606 $3,600 $1,606
-
kWh
- -
TOTAL RECOMMENDED $38,619 $44,086 $10,556
198,710
kWh
$27,707
-
MMBtu
$356
TOTAL IMPLEMENTED $12,379 $6,985 $8,610
191,090
kWh
$3,769
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs