Assessment Year | 1988 |
---|---|
Principal Product | FROZEN FRENCH FRIES |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 86 |
Plant Area |
n/a
|
Annual Production | 35,000,000
lb
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $186,968 | 4,135,111 |
kWh
|
$0.045 |
LPG | $186,231 | 43,968 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,379 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,046 | - |
$3,046
67,702
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $2,878 | $858 | - |
$2,878
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $2,704 | $1,375 | - |
$2,704
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $1,853 | $1,546 | - |
$1,853
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $125 | $114 |
$125
2,638
kWh
|
- | - | |
06 | 2.2621: Modify refrigeration system to operate at a lower pressure | $5,439 | $4,800 |
$5,439
120,750
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $696 | $845 |
$340
7,620
kWh
|
- | $356 | |
08 | 2.2136: Install / repair insulation on steam lines | $891 | $1,213 | - |
$891
-
MMBtu
|
- | |
09 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $19,381 | $29,735 | - |
$19,381
-
MMBtu
|
- | |
10 | 2.3212: Optimize plant power factor | $1,606 | $3,600 |
$1,606
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,619 | $44,086 |
$10,556
198,710
kWh
|
$27,707
-
MMBtu
|
$356 | ||
TOTAL IMPLEMENTED | $12,379 | $6,985 |
$8,610
191,090
kWh
|
$3,769
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs