ITAC Assessment: MU0098
ITAC logo
ITAC Assessment: MU0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Assembly lines
NAICS 333519: Rolling Mill and Other Metalworking Machinery Manufacturing
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 317,000
ft2
Annual Production 3
units
Production Hrs. Annual 3,042
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,042 1,870,160
kWh
Electricity Demand $129,246 5,202
kW-mo/yr
Electricity Fees $21,106 -
Natural Gas $54,333 6,605
MMBtu
Other Gas $3,689 1
MMBtu
Waste Disposal Costs
Water Usage $26,052 1,367
Tgal
TOTAL YEARLY COSTS $324,468
RECOMMENDED SAVINGS* $58,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7444: Close holes and openings in building such as broken windows $10,190 $78 $7,054
38,226
kWh
$1,835
-
kW-mo/yr
$1,301
-
MMBtu
02 2.6232: Install set-back timers $19,100 $217,800 $8,152
93,508
kWh
$4,488
-
kW-mo/yr
$6,460
-
MMBtu
03 2.2211: Use optimum temperature $1,259 $74 - - $1,259
-
MMBtu
04 2.7224: Reduce space conditioning during non-working hours $7,809 - $1,315
27,399
kWh
- $6,494
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,015 - $594
12,377
kWh
$421
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $4,396 - $21
776
kWh
$4,374
-
kW-mo/yr
-
07 2.4322: Use or replace with energy efficient substitutes $13,137 $5,182 - - $13,137
-
MMBtu
08 2.7135: Install occupancy sensors $593 $2,541 $195
4,059
kWh
$398
-
kW-mo/yr
-
09 2.7221: Lower temperature during the winter season and vice-versa $1,150 - - - $1,150
-
MMBtu
TOTAL RECOMMENDED $58,649 $225,675 $17,332
176,345
kWh
$11,516
-
kW-mo/yr
$29,801
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs