ITAC Assessment: MA0184
ITAC logo
ITAC Assessment: MA0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COSMETIC JARS AND CAPS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area
n/a
Annual Production 94,260,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,768 3,208,968
kWh
Natural Gas $63,609 16,557
MMBtu
Fuel Oil #2 $9,983 2,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $518 - $518
-
kWh
- -
02 2.7314: Reduce ventilation air $12,741 $3,500 - $12,741
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $173 $316 - $173
-
MMBtu
-
04 2.6232: Install set-back timers $1,410 $657 $1,410
19,050
kWh
- -
05 2.2511: Insulate bare equipment $5,188 $1,277 - $5,188
-
MMBtu
-
06 2.7226: Use computer programs to optimize hvac performance $6,410 $2,620 - $4,646
-
MMBtu
$1,764
-
MMBtu
TOTAL RECOMMENDED $26,440 $8,370 $1,928
19,050
kWh
$22,748
-
MMBtu
$1,764
-
MMBtu
TOTAL IMPLEMENTED $13,008 $4,554 $1,410
19,050
kWh
$9,834
-
MMBtu
$1,764
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs