ITAC Assessment: UD1153
ITAC logo
ITAC Assessment: UD1153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product education, technical training
NAICS 611519: Other Technical and Trade Schools
SIC 8249: Vocational Schools, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 50
Plant Area 66,215
ft2
Annual Production 1
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,380 975,470
kWh
Natural Gas $46,875 5,633
MMBtu
Waste Disposal Costs
Water Usage $16,100 1,500
Tgal
TOTAL YEARLY COSTS $204,355
RECOMMENDED SAVINGS* $127,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $3,450 $12,000 - $3,450
-
MMBtu
02 2.7314: Reduce ventilation air $3,005 $18,000 $1,576
10,870
kWh
$1,429
-
MMBtu
03 2.7314: Reduce ventilation air $4,207 $22,000 $2,206
15,219
kWh
$2,001
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $1,075 $2,500 $154
1,063
kWh
$921
-
MMBtu
05 2.9114: Use solar heat to make electricty $115,533 $900,000 $115,533
797,130
kWh
-
TOTAL RECOMMENDED $127,270 $954,500 $119,469
824,282
kWh
$7,801
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs