| Assessment Year | 2026 |
|---|---|
| Principal Product | Industrial Valve MAnufacturing |
| NAICS | 332911: Industrial Valve Manufacturing |
| SIC | 3491: Industrial Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
44,168
ft2
|
| Annual Production | 166,802
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,682 | 851,280 |
kWh
|
$0.095 |
| Electricity Demand | $26,433 | 3,912 |
kW-mo/yr
|
$6.76 |
| Electricity Fees | $30,893 | - |
|
- |
| TOTAL YEARLY COSTS | $138,008 | |||
| RECOMMENDED SAVINGS* | $293,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $83,684 | $322,608 |
$57,737
607,763
kWh
|
$25,947
-
kW-mo/yr
|
- | - | |
| 02 | 2.4226: Use / purchase optimum sized compressor | $18,934 | $52,105 |
$(-747.0)
(-7,860)
kWh
|
$(-319.0)
-
kW-mo/yr
|
- | $20,000 | |
| 03 | 2.3191: Use demand controller or load shedder | $8,047 | $4,580 |
$6,065
63,846
kWh
|
$1,982
-
kW-mo/yr
|
- | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $7,021 | $25,440 |
$7,021
73,902
kWh
|
- | - | - | |
| 05 | 2.2623: Minimize condenser cooling water temperature | $1,912 | $8,477 |
$1,912
20,171
kWh
|
- | - | - | |
| 06 | 4.446: Automate finishing process | $120,507 | $105,000 |
$(-3,952.0)
(-41,600)
kWh
|
$(-811.0)
-
kW-mo/yr
|
$91,520 | $33,750 | |
| 07 | 4.424: Improve space comfort conditioning | $53,493 | $12,420 |
$(-1,177.0)
(-12,413)
kWh
|
$(-242.0)
-
kW-mo/yr
|
$54,912 | - | |
| TOTAL RECOMMENDED | $293,598 | $530,630 |
$66,859
703,809
kWh
|
$26,557
-
kW-mo/yr
|
$146,432 | $53,750 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs