ITAC Assessment: UL2617
ITAC logo
ITAC Assessment: UL2617
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wooden Staves and Headings
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 275,830
ft2
Annual Production 550,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,093 5,841,250
kWh
Electricity Demand $521,760 20,018
kW-mo/yr
Electricity Fees $102,420 -
Natural Gas $113,113 13,939
MMBtu
Other Gas $9,322 1
MMBtu
Other Energy $24,135 1,222
MMBtu
TOTAL YEARLY COSTS $1,003,843
RECOMMENDED SAVINGS* $155,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,696 $1,080 $1,696
42,501
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,332 - $4,332
108,574
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,244 $32,250 $19,244
482,315
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,472 $855 $3,472
87,033
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $34,484 - $34,484
864,269
kWh
- -
06 2.3212: Optimize plant power factor $70,132 $11,173 - - $70,132
07 2.9114: Use solar heat to make electricty $22,287 $267,913 $10,207
255,790
kWh
$12,080
-
kW-mo/yr
-
TOTAL RECOMMENDED $155,647 $313,271 $73,435
1,840,482
kWh
$12,080
-
kW-mo/yr
$70,132
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs