Assessment Year | 2014 |
---|---|
Principal Product | Vinyl Extrusion |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 129 |
Plant Area |
173,000
ft2
|
Annual Production | 54,000,000
lb
|
Production Hrs. Annual | 7,632
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,295,307 | 18,967,184 |
kWh
|
$0.068 |
Electricity Demand | $158,411 | 37,212 |
kW-mo/yr
|
$4.26 |
Natural Gas | $91,582 | 8,698 |
MMBtu
|
$10.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $195,616 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,975 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,262 | - |
$2,028
34,960
kWh
|
$234
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,184 | $1,200 |
$15,227
262,487
kWh
|
$1,757
-
kW-mo/yr
|
- | $(-4,800.0) | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $7,714 | $1,800 |
$7,714
132,972
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,815 | $100 |
$2,524
43,502
kWh
|
$291
-
kW-mo/yr
|
- | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,180 | $700 | - | - |
$1,180
-
Tgal
|
- | - | |
06 | 2.4113: Install motor voltage controller on lightly loaded motors | $17,210 | $23,600 |
$15,430
265,992
kWh
|
$1,780
-
kW-mo/yr
|
- | - | - | |
07 | 2.4113: Install motor voltage controller on lightly loaded motors | $993 | $2,575 |
$890
15,346
kWh
|
$103
-
kW-mo/yr
|
- | - | - | |
08 | 2.2514: Cover open tanks | $14,519 | $39,186 |
$13,016
224,381
kWh
|
$1,503
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $129,321 | $377,745 |
$135,887
2,342,480
kWh
|
$15,688
-
kW-mo/yr
|
- | $(-22,254.0) | - | |
10 | 2.7131: Add area lighting switches | $117 | - |
$105
1,806
kWh
|
$12
-
kW-mo/yr
|
- | - | - | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,301 | - |
$(-32.0)
(-557)
kWh
|
- | - | $(-3,000.0) | $10,333 | |
TOTAL RECOMMENDED | $195,616 | $446,906 |
$192,789
3,323,369
kWh
|
$21,368
-
kW-mo/yr
|
$1,180
-
Tgal
|
$(-30,054.0) | $10,333 | ||
TOTAL IMPLEMENTED | $24,975 | $3,100 |
$27,493
473,921
kWh
|
$2,282
-
kW-mo/yr
|
- | $(-4,800.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs