ITAC Assessment: DL0281
ITAC logo
ITAC Assessment: DL0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Cylindrical cartridge filters
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 85,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $543,066 5,444,331
kWh
Electricity Demand $80,417 11,619
kW-mo/yr
Electricity Fees $13,771 -
Natural Gas $76,187 6,451
MMBtu
Other Gas $815 1
MMBtu
TOTAL YEARLY COSTS $714,256
RECOMMENDED SAVINGS* $56,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,178 - $5,178
51,778
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,909 $7,000 $14,909
149,088
kWh
03 2.6218: Turn off equipment when not in use $13,350 - $13,350
133,500
kWh
04 2.6218: Turn off equipment when not in use $12,306 - $12,306
123,060
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,584 $23,940 $10,584
105,840
kWh
TOTAL RECOMMENDED $56,327 $30,940 $56,327
563,266
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs