ITAC Assessment: GT1016
ITAC logo
ITAC Assessment: GT1016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Home Personal Care Labels
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 105,000
ft2
Annual Production 1,233
ton
Production Hrs. Annual 5,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $513,805 7,122,146
kWh
Electricity Demand $99,177 19,745
kW-mo/yr
Natural Gas $43,910 2,755
MMBtu
TOTAL YEARLY COSTS $656,892
RECOMMENDED SAVINGS* $198,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,219 $1,850 $21,181
294,176
kWh
$3,938
-
kW-mo/yr
$(-2,900.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,084 $400 $2,547
35,381
kWh
$537
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $3,932 $3,300 $3,591
49,846
kWh
$341
-
kW-mo/yr
-
04 2.6211: Conserve energy by efficient use of vending machines $121 $135 $106
1,465
kWh
$15
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $169,280 $1,244,837 $145,837
2,021,826
kWh
$23,443
-
kW-mo/yr
-
TOTAL RECOMMENDED $198,636 $1,250,522 $173,262
2,402,694
kWh
$28,274
-
kW-mo/yr
$(-2,900.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs