ITAC Assessment: WV0704
ITAC logo
ITAC Assessment: WV0704
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Complete Windows
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 275
Plant Area 195,000
ft2
Annual Production 715,000
units
Production Hrs. Annual 6,864
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,870 7,556,752
kWh
Electricity Demand $327,052 19,219
kW-mo/yr
Electricity Fees $75,370 -
Natural Gas $41,035 3,889
MMBtu
TOTAL YEARLY COSTS $832,327
RECOMMENDED SAVINGS* $28,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $8,072 $2,625 $8,072
156,742
kWh
- -
02 2.4224: Upgrade controls on compressors $6,483 $3,310 $4,109
79,788
kWh
$2,374
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,788 $22,779 $3,507
68,105
kWh
$2,281
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,126 $980 $2,611
50,693
kWh
$1,515
-
kW-mo/yr
-
05 2.6232: Install set-back timers $2,574 $1,200 - - $2,574
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,391 $720 $880
17,089
kWh
$511
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $505 $1,917 $318
6,173
kWh
$187
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,939 $33,531 $19,497
378,590
kWh
$6,868
-
kW-mo/yr
$2,574
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs