ITAC Assessment: AM0258
ITAC logo
ITAC Assessment: AM0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Thread and line pipe protectors
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 36,600
ft2
Annual Production 3,100,000
pieces
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,342 2,696,366
kWh
Electricity Demand $22,375 6,701
kW-mo/yr
Electricity Fees $1,197 -
Natural Gas $8,414 1,574
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $5,385 - - $(-21,080.0)
-
kW-mo/yr
$(-5,650.0) - $32,115
02 2.4133: Use most efficient type of electric motors $1,685 $765 $869
37,808
kWh
$816
-
kW-mo/yr
- - -
03 2.3134: Shift from daytime to nighttime operation $1,690 - - $1,690
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $1,150 $600 $1,150
49,824
kWh
- - - -
05 2.4314: Use synthetic lubricant $440 - $180
7,913
kWh
$260
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $296 $80
3,517
kWh
$320
-
kW-mo/yr
- - -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $5,490 $10,000 - - - $5,490
-
lb
-
08 3.7198: Reduce / eliminate use of disposable product $540 $110 - - - $540
-
lb
-
TOTAL RECOMMENDED $16,780 $11,771 $2,279
99,062
kWh
$(-17,994.0)
-
kW-mo/yr
$(-5,650.0) $6,030
-
lb
$32,115
TOTAL IMPLEMENTED $11,395 $11,771 $2,279
99,062
kWh
$3,086
-
kW-mo/yr
- $6,030
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs