ITAC Assessment: UA0056
ITAC logo
ITAC Assessment: UA0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product commercial print
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 1
units
Production Hrs. Annual 7,488
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,849 4,096,800
kWh
Electricity Demand $51,596 9,132
kW-mo/yr
Electricity Fees $21,053 -
Natural Gas $5,469 340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,865 $38,883 $9,430
150,985
kWh
$1,435
-
kW-mo/yr
-
02 2.7134: Use photocell controls $451 $900 $451
7,217
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,084 $640 $1,813
29,036
kWh
$271
-
kW-mo/yr
-
04 2.7261: Install timers and/or thermostats $5,615 $2,000 $4,097
65,600
kWh
- $1,518
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $6,045 $240 $5,115
81,900
kWh
- $930
-
MMBtu
TOTAL RECOMMENDED $25,060 $42,663 $20,906
334,738
kWh
$1,706
-
kW-mo/yr
$2,448
-
MMBtu
TOTAL IMPLEMENTED $22,976 $42,023 $19,093
305,702
kWh
$1,435
-
kW-mo/yr
$2,448
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs