| Assessment Year | 1982 |
|---|---|
| Principal Product | WALNUT GUNSTOCKS, LUMBER |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $1 M to 5M |
| # of Employees | 52 |
| Plant Area |
n/a
|
| Annual Production | 2,700
thousand feet
|
| Production Hrs. Annual | 2,065
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $137,818 | 2,201,934 |
kWh
|
$0.063 |
| Natural Gas | $6,767 | 2,336 |
MMBtu
|
$2.90 |
| Wood | $184,272 | 198,092 |
MMBtu
|
$0.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $127,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,854 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $311 | $520 |
$311
4,982
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $28,915 | $1,400 | - |
$28,915
-
MMBtu
|
|
| 03 | 2.6126: Keep solid fuels / raw materials dry | $14,171 | - | - |
$14,171
-
MMBtu
|
|
| 04 | 2.7441: Replace broken windows and/or window sash | $15,482 | $500 | - |
$15,482
-
MMBtu
|
|
| 05 | 2.3212: Optimize plant power factor | $2,061 | $1,800 |
$2,061
-
kWh
|
- | |
| 06 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $66,400 | $240,000 |
$66,400
1,313,013
kWh
|
- | |
| TOTAL RECOMMENDED | $127,340 | $244,220 |
$68,772
1,317,995
kWh
|
$58,568
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,854 | $2,820 |
$2,372
4,982
kWh
|
$15,482
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs