Assessment Year | 1998 |
---|---|
Principal Product | Custom injection molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
78,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 8,569
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,539 | 2,752,931 |
kWh
|
$0.046 |
Electricity Demand | $90,519 | 6,011 |
kW-mo/yr
|
$15.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $261,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $178,605 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $83,038 | $163,750 |
$60,349
1,312,427
kWh
|
$22,689
-
kW-mo/yr
|
- | - | - | |
02 | 2.3134: Shift from daytime to nighttime operation | $5,837 | - | - |
$5,837
-
kW-mo/yr
|
- | - | - | |
03 | 2.2515: Use optimum thickness insulation | $2,817 | $1,076 | - | - |
$2,817
-
MMBtu
|
- | - | |
04 | 2.7144: Install spectral reflectors / delamp | $519 | $1,260 |
$222
4,689
kWh
|
$297
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,374 | - |
$1,651
36,049
kWh
|
$723
-
kW-mo/yr
|
- | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,218 | $8,500 | - | - | - |
$3,218
-
Tgal
|
- | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,426 | $1,275 | - | - | - | - | $6,426 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $157,414 | $12,000 | - | - | - | - | $157,414 | |
TOTAL RECOMMENDED | $261,643 | $187,861 |
$62,222
1,353,165
kWh
|
$29,546
-
kW-mo/yr
|
$2,817
-
MMBtu
|
$3,218
-
Tgal
|
$163,840 | ||
TOTAL IMPLEMENTED | $178,605 | $24,111 |
$1,873
40,738
kWh
|
$6,857
-
kW-mo/yr
|
$2,817
-
MMBtu
|
$3,218
-
Tgal
|
$163,840 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs