Assessment Year | 1993 |
---|---|
Principal Product | Special order plasma coa |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 48 |
Plant Area |
27,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,692
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $149,804 | 1,315,358 |
kWh
|
$0.11 |
Fuel Oil #2 | $21,748 | 3,980 |
MMBtu
|
$5.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,082 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $11,082 | $2,800 |
$11,082
97,304
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,408 | $23,620 |
$5,408
47,479
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $567 | $170 |
$567
4,982
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $(-3,869.0) | $18,000 |
$(-5,241.0)
(-46,014)
kWh
|
$1,372
-
MMBtu
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,266 | $143 | - | - |
$2,266
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $2,003 | $1,560 |
$2,003
17,585
kWh
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $634 | $68 |
$634
5,569
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,091 | $46,361 |
$14,453
126,905
kWh
|
$1,372
-
MMBtu
|
$2,266
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,082 | $2,800 |
$11,082
97,304
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs