ITAC Assessment: MA0279
ITAC logo
ITAC Assessment: MA0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Special order plasma coa
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 27,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,692
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,804 1,315,358
kWh
Fuel Oil #2 $21,748 3,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.6231: Utilize controls to operate equipment only when needed $11,082 $2,800 $11,082
97,304
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,408 $23,620 $5,408
47,479
kWh
- -
03 2.7135: Install occupancy sensors $567 $170 $567
4,982
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $(-3,869.0) $18,000 $(-5,241.0)
(-46,014)
kWh
$1,372
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $2,266 $143 - - $2,266
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $2,003 $1,560 $2,003
17,585
kWh
- -
07 2.4239: Eliminate or reduce compressed air usage $634 $68 $634
5,569
kWh
- -
TOTAL RECOMMENDED $18,091 $46,361 $14,453
126,905
kWh
$1,372
-
MMBtu
$2,266
-
MMBtu
TOTAL IMPLEMENTED $11,082 $2,800 $11,082
97,304
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs