ITAC Assessment: WV0099
ITAC logo
ITAC Assessment: WV0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal Fabricated Shelving Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 44
Plant Area 144,000
ft2
Annual Production 14,800,000
lb
Production Hrs. Annual 3,510
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,944 1,330,598
kWh
Electricity Demand $93,048 5,468
kW-mo/yr
Electricity Fees $6,052 -
Natural Gas $77,062 11,841
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,104 $1,410 $4,308
118,699
kWh
$11,796
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $2,402 $1,998 $213
5,862
kWh
$2,189
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $369 $480 $369
9,965
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $386 $184 $386
10,551
kWh
- - - -
05 2.4314: Use synthetic lubricant $446 $1,300 $446
12,309
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $585 $14 $585
16,120
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $653 $70 $653
17,878
kWh
- - - -
08 2.7241: Install outside air damper / economizer on hvac unit $842 $1,347 $842
23,154
kWh
- - - -
09 2.1113: Reduce combustion air flow to optimum $8,365 $5,000 - - $8,365
-
MMBtu
- -
10 2.2511: Insulate bare equipment $305 $100 - - $305
-
MMBtu
- -
11 3.1191: Change procedures / equipment / operating conditions $4,168 $40,000 - - - - $4,168
12 3.4113: Treat and reuse rinse waters $3,288 $2,910 $(-383.0)
(-10,551)
kWh
- - $4,892
-
Tgal
$(-1,221.0)
13 3.5217: Reuse / recycle/ sell paper products $11,192 $150 - - - - $11,192
TOTAL RECOMMENDED $49,105 $54,963 $7,419
203,987
kWh
$13,985
-
kW-mo/yr
$8,670
-
MMBtu
$4,892
-
Tgal
$14,139
TOTAL IMPLEMENTED $32,137 $5,606 $6,960
191,384
kWh
$13,985
-
kW-mo/yr
- - $11,192
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs