ITAC Assessment: ME0111
ITAC logo
ITAC Assessment: ME0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Structual Steel Products
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 60,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,605 1,122,216
kWh
Fuel Oil #6 $15,830 3,158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $980 $1,500 - $980
-
MMBtu
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $2,120 $3,500 - $2,120
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,270 $2,000 $1,270
17,878
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $590 $100 $590
6,448
kWh
-
TOTAL RECOMMENDED $4,960 $7,100 $1,860
24,326
kWh
$3,100
-
MMBtu
TOTAL IMPLEMENTED $2,840 $3,600 $1,860
24,326
kWh
$980
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs