Assessment Year 2008
Principal Product Newspapers and Associated Printed Products
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 224
Plant Area 86,450
ft2
Annual Production 17,520,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,229 1,364,053
kWh
Electricity Demand $33,977 3,285
kW-mo/yr
Electricity Fees $10,488 -
Natural Gas $48,688 4,806
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,003 $25,980 $3,446
64,203
kWh
$2,557
-
kW-mo/yr
- -
02 2.2414: Use waste heat from hot flue gases to preheat $1,418 $4,000 - - $1,418
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,388 $1,200 - - $1,388
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,188 $1,520 $888
16,542
kWh
$300
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,000 $700 - - - $1,000
06 2.7447: Install vinyl strip / high speed / air curtain doors $658 $1,110 - - $658
-
MMBtu
-
07 2.7111: Reduce illumination to minimum necessary levels $427 $500 $250
4,648
kWh
$177
-
kW-mo/yr
- -
TOTAL RECOMMENDED $12,082 $35,010 $4,584
85,393
kWh
$3,034
-
kW-mo/yr
$3,464
-
MMBtu
$1,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs