ITAC Assessment: GT0171
ITAC logo
ITAC Assessment: GT0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product FLUORESCENT LIGHT FIXTURES
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 460
Plant Area
n/a
Annual Production 3,120,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,154 5,111,079
kWh
Natural Gas $47,604 10,133
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,190 $16,000 $7,190
137,456
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $6,260 $20,600 - $6,260
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $10,142 $9,853 $10,142
213,658
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,750 $12,500 - $4,750
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,760 $1,029 $2,760
52,755
kWh
-
06 2.3191: Use demand controller or load shedder $5,660 $3,000 $5,660
-
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $613 $2,470 $613
12,896
kWh
-
TOTAL RECOMMENDED $37,375 $65,452 $26,365
416,765
kWh
$11,010
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs