Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,796 matching assessments
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated metal products, except machinery and transportation equipment
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
NT0061 2026 Steel framing 7 $291k $403k
WM0259 2026 Heat exchangers 5 $1,928k $207k
MU0083 2026 Couplings and hoses for aerospace applications 12 $800k $70k
MS0465 2026 Sofa sleeper mechanisms & mattresses 7 $157k $70k
WV0697 2026 Vacuum formed ceramic fiber shapes 11 $508k $46k
UD1127 2026 Processed steel and aluminum 3 $110k $23k
MU0082 2026 Injection molds and rubber and plastic products 12 $315k $29k
UL2601 2026 Steel products 7 $245k $55k
MS0464 2026 Rocker chair hardware 6 $712k $102k
LT8442 2026 S.e.t (surface enhancement technology) wear materials 4 $66k $76k
UU0295 2026 Fabricated structural and architectural metal 7 $130k $538k
NL0127 2026 Specialty automotive tools 8 $255k $38k
IC0340 2026 Steel drums 9 $450k $19k
UU0294 2026 Firearm sights 7 $129k $48k
MZ0391 2025 Lubrication equipment 6 $613k $192k
UC2518 2025 Metal fabrication and custom-built products 6 $347k $39k
GT1001 2025 Demountable interior walls 10 $217k $131k
TT0351 2025 Valves and components 7 $104k $50k
UA0305 2025 Flow control instruments 7 $612k $236k
UA0304 2025 Valves, fittings and regulators 6 $379k $197k