ITAC Assessment: LE0619
ITAC logo
ITAC Assessment: LE0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Precision Metal Components
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 60,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,485 1,037,389
kWh
Electricity Demand $23,714 4,304
kW-mo/yr
Electricity Fees $5,147 -
Natural Gas $10,220 2,431
MMBtu
Waste Disposal Costs
Water Usage $33,904 2,346
Tgal
Water Disposal $21,506 2,340
Tgal
TOTAL YEARLY COSTS $206,976
RECOMMENDED SAVINGS* $53,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,477 $1,318 $1,301
12,044
kWh
$176
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,171 $1,000 $1,099
10,175
kWh
$72
-
kW-mo/yr
- -
03 4.651: Install back-up equipment $28,409 $40,000 - - - $28,409
04 2.2443: Re-use or recycle hot or cold process exhaust air $2,218 $4,000 - - $2,218
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,009 $2,000 $943
8,736
kWh
$66
-
kW-mo/yr
- -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $2,180 $6,564 $1,921
17,789
kWh
$259
-
kW-mo/yr
- -
07 2.7232: Replace existing hvac unit with high efficiency model $13,065 $57,445 $6,750
62,496
kWh
$331
-
kW-mo/yr
- $5,984
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,777 $18,000 $3,529
32,675
kWh
$248
-
kW-mo/yr
- -
TOTAL RECOMMENDED $53,306 $130,327 $15,543
143,915
kWh
$1,152
-
kW-mo/yr
$2,218
-
MMBtu
$34,393
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs