ITAC Assessment: OK1172
ITAC logo
ITAC Assessment: OK1172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Steel, titanium, & aluminum specially treated parts for aircraft
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 160,000
ft2
Annual Production 772,891
pieces
Production Hrs. Annual 7,644
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,668 3,746,569
kWh
Electricity Demand $183,632 8,444
kW-mo/yr
Natural Gas $190,888 38,297
MMBtu
Waste Disposal Costs
Water Usage $163,632 44,008
Tgal
Water Disposal $211,295 44,008
Tgal
TOTAL YEARLY COSTS $911,115
RECOMMENDED SAVINGS* $153,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.3134: Shift from daytime to nighttime operation $16,078 - - $16,078
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,656 $19,265 $8,995
224,884
kWh
$3,661
-
kW-mo/yr
- - -
03 2.1224: Replace boiler $29,600 $140,000 - - $29,600
-
MMBtu
- -
04 2.5194: Redesign process $51,525 $143,270 - - - $24,574
-
Tgal
$26,951
-
Tgal
05 2.1133: Adjust burners for efficient operation $1,716 $1,300 - - $1,716
-
MMBtu
- -
06 2.7261: Install timers and/or thermostats $11,793 $500 - - $11,793
-
MMBtu
- -
07 2.9114: Use solar heat to make electricty $30,579 $511,000 $30,579
764,462
kWh
- - - -
TOTAL RECOMMENDED $153,947 $815,335 $39,574
989,346
kWh
$19,739
-
kW-mo/yr
$43,109
-
MMBtu
$24,574
-
Tgal
$26,951
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs