ITAC Assessment: AM1009
ITAC logo
ITAC Assessment: AM1009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2027
Principal Product oilfield and industrial hand tools and heavy-duty mechanical components
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 88,650
ft2
Annual Production 612,196
pieces
Production Hrs. Annual 2,900
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,276 743,413
kWh
Electricity Demand $61,864 4,014
kW-mo/yr
Electricity Fees $3,551 -
LPG $2,364 48
MMBtu
Waste Disposal Costs
Water Usage $2,341 242
Tgal
TOTAL YEARLY COSTS $114,396
RECOMMENDED SAVINGS* $167,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $2,830 $2,739 - $2,830
-
kW-mo/yr
- -
02 2.8112: Combine utility meters $8,665 $25,923 - $6,897
-
kW-mo/yr
$1,768 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $421 $679
11,000
kWh
$734
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,183 $30 $1,160
18,800
kWh
$2,023
-
kW-mo/yr
- -
05 2.7224: Reduce space conditioning during non-working hours $1,712 $105 $1,712
27,750
kWh
- - -
06 4.631: Install an uninteruptable power supply $145,000 $288,927 - - - $145,000
07 2.4224: Upgrade controls on compressors $4,640 $40,001 $1,957
31,718
kWh
$2,683
-
kW-mo/yr
- -
TOTAL RECOMMENDED $167,443 $358,146 $5,508
89,268
kWh
$15,167
-
kW-mo/yr
$1,768 $145,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs