Assessment Year | 2021 |
---|---|
Principal Product | Specialty Metals, Sputtering Targets |
NAICS | 333242: Semiconductor Machinery Manufacturing |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
16,700
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $76,037 | 687,200 |
kWh
|
$0.11 | |
Electricity Demand | $28,728 | 3,420 |
kW-mo/yr
|
$8.40 | |
Electricity Fees | $4,042 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $283 | 33 |
Tgal
|
$8.58 | |
TOTAL YEARLY COSTS | $109,090 | ||||
RECOMMENDED SAVINGS* | $55,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $41,214 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $5,397 | $525 |
$5,397
45,916
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,203 | $110 |
$1,092
9,293
kWh
|
$111
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $3,116 | $1,412 |
$3,116
26,512
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,435 | $3,959 |
$2,435
20,711
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,548 | $4,226 |
$1,720
14,633
kWh
|
$656
-
kW-mo/yr
|
$134 | $38 | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,263 | $18,437 |
$4,265
36,283
kWh
|
$998
-
kW-mo/yr
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $35,550 | $236,909 |
$34,050
289,664
kWh
|
$1,500
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $55,512 | $265,578 |
$52,075
443,012
kWh
|
$3,265
-
kW-mo/yr
|
$134 | $38 | ||
TOTAL IMPLEMENTED | $41,214 | $242,547 |
$38,886
330,809
kWh
|
$2,156
-
kW-mo/yr
|
$134 | $38 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs