ITAC Assessment: SF0561
ITAC logo
ITAC Assessment: SF0561
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Specialty Metals, Sputtering Targets
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 16,700
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,037 687,200
kWh
Electricity Demand $28,728 3,420
kW-mo/yr
Electricity Fees $4,042 -
Waste Disposal Costs
Water Usage $283 33
Tgal
TOTAL YEARLY COSTS $109,090
RECOMMENDED SAVINGS* $55,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.6231: Utilize controls to operate equipment only when needed $5,397 $525 $5,397
45,916
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,203 $110 $1,092
9,293
kWh
$111
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $3,116 $1,412 $3,116
26,512
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,435 $3,959 $2,435
20,711
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,548 $4,226 $1,720
14,633
kWh
$656
-
kW-mo/yr
$134 $38
06 2.2614: Use cooling tower or economizer to replace chiller cooling $5,263 $18,437 $4,265
36,283
kWh
$998
-
kW-mo/yr
- -
07 2.9114: Use solar heat to make electricty $35,550 $236,909 $34,050
289,664
kWh
$1,500
-
kW-mo/yr
- -
TOTAL RECOMMENDED $55,512 $265,578 $52,075
443,012
kWh
$3,265
-
kW-mo/yr
$134 $38
TOTAL IMPLEMENTED $41,214 $242,547 $38,886
330,809
kWh
$2,156
-
kW-mo/yr
$134 $38
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs