| Assessment Year | 1984 |
|---|---|
| Principal Product | CARPET |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
n/a
|
| Annual Production | 54,000
thousand feet
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $157,825 | 3,776,964 |
kWh
|
$0.042 |
| Natural Gas | $154,425 | 3,500 |
MMBtu
|
$44.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,280 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2522: Isolate hot or cold equipment | $4,600 | $1,000 |
$4,600
111,372
kWh
|
- | |
| 02 | 2.5192: Modify textile dryers | $9,110 | $7,500 | - |
$9,110
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,260 | $2,957 |
$2,260
52,755
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,240 | $4,800 | - |
$3,240
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $1,370 | $2,000 | - |
$1,370
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $810 | $500 |
$810
20,516
kWh
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $940 | $1,582 |
$940
22,567
kWh
|
- | |
| 08 | 2.3191: Use demand controller or load shedder | $6,500 | $14,000 |
$6,500
-
kWh
|
- | |
| 09 | 2.7251: Reduce air conditioning load by evaporating water from roof | $820 | $6,438 |
$820
19,343
kWh
|
- | |
| TOTAL RECOMMENDED | $29,650 | $40,777 |
$15,930
226,553
kWh
|
$13,720
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,280 | $15,039 |
$7,800
186,694
kWh
|
$10,480
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs