ITAC Assessment: GT0232
ITAC logo
ITAC Assessment: GT0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 54,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,825 3,776,964
kWh
Natural Gas $154,425 3,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2522: Isolate hot or cold equipment $4,600 $1,000 $4,600
111,372
kWh
-
02 2.5192: Modify textile dryers $9,110 $7,500 - $9,110
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,260 $2,957 $2,260
52,755
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,240 $4,800 - $3,240
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,370 $2,000 - $1,370
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $810 $500 $810
20,516
kWh
-
07 2.4322: Use or replace with energy efficient substitutes $940 $1,582 $940
22,567
kWh
-
08 2.3191: Use demand controller or load shedder $6,500 $14,000 $6,500
-
kWh
-
09 2.7251: Reduce air conditioning load by evaporating water from roof $820 $6,438 $820
19,343
kWh
-
TOTAL RECOMMENDED $29,650 $40,777 $15,930
226,553
kWh
$13,720
-
MMBtu
TOTAL IMPLEMENTED $18,280 $15,039 $7,800
186,694
kWh
$10,480
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs