Assessment Year | 2010 |
---|---|
Principal Product | Textiles |
NAICS | 314110: Carpet and Rug Mills |
SIC | 2273: Carpets and Rugs |
Sales Range | $100 M to 500M |
# of Employees | 550 |
Plant Area |
292,582
ft2
|
Annual Production | 31,052,992
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,389,203 | 23,678,600 |
kWh
|
$0.059 |
Electricity Demand | $597,251 | 43,307 |
kW-mo/yr
|
$13.79 |
Electricity Fees | $21,946 | - |
|
- |
Natural Gas | $954,251 | 94,532 |
MMBtu
|
$10.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $434,054 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $185,215 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $75,096 | $640 |
$57,704
983,542
kWh
|
$17,392
-
kW-mo/yr
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $123,482 | $302,000 |
$94,435
1,609,595
kWh
|
$29,047
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,529 | $45,740 |
$32,165
548,264
kWh
|
$10,364
-
kW-mo/yr
|
- | |
04 | 2.2121: Increase amount of condensate returned | $103,313 | $74,525 | - | - |
$103,313
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $4,904 | $2,890 | - | - |
$4,904
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $70,430 | $4,075 | - | - |
$70,430
-
MMBtu
|
|
07 | 2.7221: Lower temperature during the winter season and vice-versa | $14,300 | $160 |
$14,300
243,734
kWh
|
- | - | |
TOTAL RECOMMENDED | $434,054 | $430,030 |
$198,604
3,385,135
kWh
|
$56,803
-
kW-mo/yr
|
$178,647
-
MMBtu
|
||
TOTAL IMPLEMENTED | $185,215 | $350,790 |
$140,900
2,401,593
kWh
|
$39,411
-
kW-mo/yr
|
$4,904
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs