ITAC Assessment: TN0592
ITAC logo
ITAC Assessment: TN0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Graduation announcements and cards
NAICS
n/a
SIC 2753:
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 87,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,656 1,874,560
kWh
Electricity Demand $44,080 5,639
kW-mo/yr
Natural Gas $7,943 1,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.5311: Recover and reuse waste material $20,100 $3,160 $(-500.0)
(-16,120)
kWh
- - $23,600
-
lb
$(-3,000.0) - - -
02 3.1191: Change procedures / equipment / operating conditions $8,810 $7,200 $(-1,209.0)
(-38,980)
kWh
- - $140
-
lb
- $9,900 - $(-21.0)
-
Tgal
03 3.8314: Purchase high materials in returnable bulk containers $3,040 $600 - - - $690
-
lb
- $2,350 - -
04 2.7226: Use computer programs to optimize hvac performance $2,820 $5,440 $2,470
79,719
kWh
- $350
-
MMBtu
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,505 - $291
9,379
kWh
$2,484
-
kW-mo/yr
- - - - $(-270.0) -
06 3.1111: Cover ink containers when not in use $1,400 - - - - $1,900
-
lb
$(-500.0) - - -
07 2.7135: Install occupancy sensors $860 $1,600 $860
27,843
kWh
- - - - - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $730 $1,480 $520
16,706
kWh
- $210
-
MMBtu
- - - - -
09 2.6232: Install set-back timers $200 $435 $200
6,448
kWh
- - - - - - -
10 2.4221: Install compressor air intakes in coolest locations $109 $300 $55
1,758
kWh
$54
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $40,574 $20,215 $2,687
86,753
kWh
$2,538
-
kW-mo/yr
$560
-
MMBtu
$26,330
-
lb
$(-3,500.0) $12,250 $(-270.0) $(-21.0)
-
Tgal
TOTAL IMPLEMENTED $5,325 $5,440 $2,761
89,098
kWh
$2,484
-
kW-mo/yr
$350
-
MMBtu
- - - $(-270.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs