Assessment Year | 1998 |
---|---|
Principal Product | Corrugated Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
120,000
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 2,912
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,096 | 599,648 |
kWh
|
$0.097 |
Electricity Demand | $40,447 | 3,548 |
kW-mo/yr
|
$11.40 |
Electricity Fees | $3,730 | - |
|
- |
Natural Gas | $45,432 | 11,566 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,878 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,695 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,421 | $10,400 |
$3,299
66,530
kWh
|
$3,122
-
kW-mo/yr
|
- | - | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $4,131 | $9,600 | - | - | - |
$4,131
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,791 | $14,171 |
$1,427
28,429
kWh
|
$1,364
-
kW-mo/yr
|
- | - | - | |
04 | 2.7134: Use photocell controls | $2,278 | $3,600 |
$2,278
24,912
kWh
|
- | - | - | - | |
05 | 4.811: Demolish old building to reduce tax and insurance bills | $868 | $250 | - | - | $868 | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $410 | $180 |
$410
4,396
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $240 |
$289
2,052
kWh
|
- | - | - | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $256 | $600 | - | - | - | - |
$256
-
Tgal
|
|
09 | 2.7122: Disconnect ballasts | $194 | $176 |
$194
2,052
kWh
|
- | - | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $167 | $600 |
$167
1,758
kWh
|
- | - | - | - | |
11 | 2.2437: Recover waste heat from equipment | $73 | $300 | - | - | - |
$73
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $17,878 | $40,117 |
$8,064
130,129
kWh
|
$4,486
-
kW-mo/yr
|
$868 |
$4,204
-
MMBtu
|
$256
-
Tgal
|
||
TOTAL IMPLEMENTED | $9,695 | $25,051 |
$5,136
99,355
kWh
|
$4,486
-
kW-mo/yr
|
- |
$73
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs