ITAC Assessment: DL0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Concrete components
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 77,000
ft2
Annual Production 19,200
ton
Production Hrs. Annual 3,850
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,356 542,352
kWh
Electricity Demand $8,724 2,169
kW-mo/yr
Electricity Fees $1,968 -
LPG $32,545 1,789
MMBtu
Fuel Oil #1 $15,076 380
MMBtu
TOTAL YEARLY COSTS $114,669
RECOMMENDED SAVINGS* $29,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings
01 2.7226: Use computer programs to optimize hvac performance $2,231 - $2,100
20,192
kWh
$131
-
kW-mo/yr
- -
02 2.7221: Lower temperature during the winter season and vice-versa $2,414 - $1,661
15,974
kWh
$244
-
kW-mo/yr
$509
-
MMBtu
-
03 2.6212: Turn off equipment during breaks, reduce operating time $1,824 - $1,590
15,287
kWh
$234
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $1,180 $1,075 $1,023
9,832
kWh
$157
-
kW-mo/yr
- -
05 2.2134: Eliminate leaks in high pressure reducing stations $386 $1,750 $335
3,224
kWh
$51
-
kW-mo/yr
- -
06 2.4322: Use or replace with energy efficient substitutes $1,096 $13,500 $950
9,130
kWh
$146
-
kW-mo/yr
- -
07 3.5112: Reprocess spent oils on site for re-use $1,561 $16,500 - - $1,561
-
MMBtu
-
08 2.7231: Use radiant heater for spot heating $10,284 $6,448 - - $(-4,792.0)
-
MMBtu
$15,076
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $8,031 $7,046 $6,963
66,950
kWh
$1,068
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,007 $46,319 $14,622
140,589
kWh
$2,031
-
kW-mo/yr
$(-2,722.0)
-
MMBtu
$15,076
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs