| Assessment Year | 2026 |
|---|---|
| Principal Product | painted aluminum coils |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 65 |
| Plant Area |
215,250
ft2
|
| Annual Production | 96,000,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $436,339 | 4,675,750 |
kWh
|
$0.093 | |
| Electricity Demand | $53,617 | 15,120 |
kW-mo/yr
|
$3.55 | |
| Natural Gas | $1,342,509 | 166,318 |
MMBtu
|
$8.07 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,726 | 1,872 |
Tgal
|
$1.99 | |
| Water Disposal | $13,270 | 1,872 |
Tgal
|
$7.09 | |
| TOTAL YEARLY COSTS | $1,849,461 | ||||
| RECOMMENDED SAVINGS* | $752,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,416 | - |
$689
7,379
kWh
|
- |
$727
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,514 | $1,050 |
$5,188
55,614
kWh
|
$326
-
kW-mo/yr
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,900 | - |
$5,546
59,635
kWh
|
$354
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,298 | $875 |
$1,298
13,910
kWh
|
- | - | |
| 05 | 2.2443: Re-use or recycle hot or cold process exhaust air | $737,920 | $540,000 | - | - |
$737,920
-
MMBtu
|
|
| TOTAL RECOMMENDED | $752,048 | $541,925 |
$12,721
136,538
kWh
|
$680
-
kW-mo/yr
|
$738,647
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs