ITAC Assessment: MZ0401
ITAC logo
ITAC Assessment: MZ0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product painted aluminum coils
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 215,250
ft2
Annual Production 96,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,339 4,675,750
kWh
Electricity Demand $53,617 15,120
kW-mo/yr
Natural Gas $1,342,509 166,318
MMBtu
Waste Disposal Costs
Water Usage $3,726 1,872
Tgal
Water Disposal $13,270 1,872
Tgal
TOTAL YEARLY COSTS $1,849,461
RECOMMENDED SAVINGS* $752,048 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,416 - $689
7,379
kWh
- $727
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,514 $1,050 $5,188
55,614
kWh
$326
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,900 - $5,546
59,635
kWh
$354
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,298 $875 $1,298
13,910
kWh
- -
05 2.2443: Re-use or recycle hot or cold process exhaust air $737,920 $540,000 - - $737,920
-
MMBtu
TOTAL RECOMMENDED $752,048 $541,925 $12,721
136,538
kWh
$680
-
kW-mo/yr
$738,647
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs