ITAC Assessment: ST0020
ITAC logo
ITAC Assessment: ST0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CUSTOM STEEL FABRICATING
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,338
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,031 216,002
kWh
Natural Gas $13,107 1,902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,174 $532 $1,174
10,551
kWh
-
02 2.6121: Reduce hot water temperature to the minimum required $101 - - $101
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $581 $537 - $581
-
MMBtu
04 2.1123: Install automatic stack damper $886 $1,074 - $886
-
MMBtu
05 2.4227: Use compressor air filters $1,957 $120 $1,957
17,585
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,756 $1,900 $1,756
-
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,620 $64 $3,620
32,532
kWh
-
08 2.7492: Use proper thickness of insulation on building envelope $1,102 $600 - $1,102
-
MMBtu
09 2.7447: Install vinyl strip / high speed / air curtain doors $723 $278 - $723
-
MMBtu
TOTAL RECOMMENDED $11,900 $5,105 $8,507
60,668
kWh
$3,393
-
MMBtu
TOTAL IMPLEMENTED $11,900 $5,105 $8,507
60,668
kWh
$3,393
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs