Assessment Year | 1985 |
---|---|
Principal Product | CUSTOM STEEL FABRICATING |
NAICS |
n/a
|
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $1 M to 5M |
# of Employees | 36 |
Plant Area |
n/a
|
Annual Production | 400,000
lb
|
Production Hrs. Annual | 2,338
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,031 | 216,002 |
kWh
|
$0.11 |
Natural Gas | $13,107 | 1,902 |
MMBtu
|
$6.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,900 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,174 | $532 |
$1,174
10,551
kWh
|
- | |
02 | 2.6121: Reduce hot water temperature to the minimum required | $101 | - | - |
$101
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $581 | $537 | - |
$581
-
MMBtu
|
|
04 | 2.1123: Install automatic stack damper | $886 | $1,074 | - |
$886
-
MMBtu
|
|
05 | 2.4227: Use compressor air filters | $1,957 | $120 |
$1,957
17,585
kWh
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,756 | $1,900 |
$1,756
-
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,620 | $64 |
$3,620
32,532
kWh
|
- | |
08 | 2.7492: Use proper thickness of insulation on building envelope | $1,102 | $600 | - |
$1,102
-
MMBtu
|
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $723 | $278 | - |
$723
-
MMBtu
|
|
TOTAL RECOMMENDED | $11,900 | $5,105 |
$8,507
60,668
kWh
|
$3,393
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,900 | $5,105 |
$8,507
60,668
kWh
|
$3,393
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs