ITAC Assessment: MZ0137
ITAC logo
ITAC Assessment: MZ0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product brake cables
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 132,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,604 2,772,468
kWh
Electricity Demand $20,592 9,131
kW-mo/yr
Natural Gas $81,920 8,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,036 - $946
13,320
kWh
$90
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,989 $1,920 $1,989
28,015
kWh
- -
03 2.4234: Cool compressor air intake with heat exchanger $856 $2,050 $781
11,000
kWh
$75
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $16,610 - $4,200
59,157
kWh
$334
-
kW-mo/yr
$12,076
-
MMBtu
05 2.2437: Recover waste heat from equipment $805 $1,475 - - $805
-
MMBtu
06 2.7442: Keep doors and windows shut when not on use $8,378 - - - $8,378
-
MMBtu
07 2.7229: Air condition only space necessary $4,215 - - - $4,215
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,678 $7,200 $4,678
65,881
kWh
- -
TOTAL RECOMMENDED $38,567 $12,645 $12,594
177,373
kWh
$499
-
kW-mo/yr
$25,474
-
MMBtu
TOTAL IMPLEMENTED $28,638 $5,445 $6,970
98,172
kWh
$409
-
kW-mo/yr
$21,259
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs