| Assessment Year | 2026 |
|---|---|
| Principal Product | Sintered Powder Metal Parts |
| NAICS | 332117: Powder Metallurgy Part Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 45 |
| Plant Area |
12,000
ft2
|
| Annual Production | 250
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $221,079 | 1,685,978 |
kWh
|
$0.13 |
| Electricity Demand | $74,130 | 3,727 |
kW-mo/yr
|
$19.89 |
| Electricity Fees | $37,287 | - |
|
- |
| Natural Gas | $3,306 | 144 |
MMBtu
|
$22.91 |
| TOTAL YEARLY COSTS | $335,802 | |||
| RECOMMENDED SAVINGS* | $405,834 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $54,912 | $151,135 |
$33,431
255,000
kWh
|
$21,481
-
kW-mo/yr
|
- | - | |
| 02 | 2.3141: Use battery storage for demand control | $67,670 | $104,340 |
$(-354.0)
(-27,000)
kWh
|
$68,024
-
kW-mo/yr
|
- | - | |
| 03 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $13,526 | $5,200 |
$13,526
103,177
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $104 | $424 |
$80
607
kWh
|
$24
-
kW-mo/yr
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $7,546 | $10,147 |
$5,372
40,978
kWh
|
$2,174
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $958 | - |
$958
7,309
kWh
|
- | - | - | |
| 07 | 4.212: Adopt in-house material generation | $117,916 | $464,200 |
$(-18,884.2)
(-143,739)
kWh
|
- | - | $136,800 | |
| 08 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $13,711 | $1,283 |
$9,107
69,465
kWh
|
$4,605
-
kW-mo/yr
|
- | - | |
| 09 | 2.2437: Recover waste heat from equipment | $619 | $1,500 | - | - |
$619
-
MMBtu
|
- | |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $125,227 | - | - |
$125,227
-
kW-mo/yr
|
- | - | |
| 11 | 2.7232: Replace existing hvac unit with high efficiency model | $3,646 | $11,700 |
$3,514
26,803
kWh
|
$132
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $405,834 | $749,929 |
$46,749
332,600
kWh
|
$221,666
-
kW-mo/yr
|
$619
-
MMBtu
|
$136,800 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs