ITAC Assessment: SD0697
ITAC logo
ITAC Assessment: SD0697
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sintered Powder Metal Parts
NAICS 332117: Powder Metallurgy Part Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 12,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,079 1,685,978
kWh
Electricity Demand $74,130 3,727
kW-mo/yr
Electricity Fees $37,287 -
Natural Gas $3,306 144
MMBtu
TOTAL YEARLY COSTS $335,802
RECOMMENDED SAVINGS* $405,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.9114: Use solar heat to make electricty $54,912 $151,135 $33,431
255,000
kWh
$21,481
-
kW-mo/yr
- -
02 2.3141: Use battery storage for demand control $67,670 $104,340 $(-354.0)
(-27,000)
kWh
$68,024
-
kW-mo/yr
- -
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $13,526 $5,200 $13,526
103,177
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $104 $424 $80
607
kWh
$24
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $7,546 $10,147 $5,372
40,978
kWh
$2,174
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $958 - $958
7,309
kWh
- - -
07 4.212: Adopt in-house material generation $117,916 $464,200 $(-18,884.2)
(-143,739)
kWh
- - $136,800
08 2.1121: Use insulation in furnaces to facilitate heating / cooling $13,711 $1,283 $9,107
69,465
kWh
$4,605
-
kW-mo/yr
- -
09 2.2437: Recover waste heat from equipment $619 $1,500 - - $619
-
MMBtu
-
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $125,227 - - $125,227
-
kW-mo/yr
- -
11 2.7232: Replace existing hvac unit with high efficiency model $3,646 $11,700 $3,514
26,803
kWh
$132
-
kW-mo/yr
- -
TOTAL RECOMMENDED $405,834 $749,929 $46,749
332,600
kWh
$221,666
-
kW-mo/yr
$619
-
MMBtu
$136,800
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs