ITAC Assessment: SD0701
ITAC logo
ITAC Assessment: SD0701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal Forgings
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 90,000
ft2
Annual Production 225
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,300 7,846,542
kWh
Electricity Demand $1,022,007 15,744
kW-mo/yr
Electricity Fees $15,053 -
Natural Gas $174,893 12,605
MMBtu
TOTAL YEARLY COSTS $1,338,253
RECOMMENDED SAVINGS* $2,288,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $605,975 $1,453,756 $34,076
2,116,520
kWh
$571,899
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $1,255,541 $298,093 $(-2,415.0)
(-150,000)
kWh
$1,257,956
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $84 $424 $12
774
kWh
$72
-
kW-mo/yr
-
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $918 $8,600 $918
56,999
kWh
- -
05 2.4133: Use most efficient type of electric motors $3,266 $34,026 $202
12,538
kWh
$3,064
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,018 $2,153 $488
30,326
kWh
$7,530
-
kW-mo/yr
-
07 2.2414: Use waste heat from hot flue gases to preheat $1,956 $1,671 - - $1,956
-
MMBtu
08 2.1121: Use insulation in furnaces to facilitate heating / cooling $83,314 $23,101 $12,743
791,521
kWh
$70,570
-
kW-mo/yr
-
09 2.1221: Replace obsolete burners with more efficient ones $155,489 - - - $155,489
-
MMBtu
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $174,361 $805,450 $38,259
2,376,353
kWh
$136,102
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,288,922 $2,627,273 $84,284
5,235,031
kWh
$2,047,192
-
kW-mo/yr
$157,446
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs