Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,159

matching recommendations
$
$
ARC Cooling
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1112 #06 Y:2025 Utilize a less expensive cooling method $105,155 $50,000
UD1112 #04 Y:2025 Utilize a less expensive cooling method $204 $150
UU0271 #02 Y:2025 Chill water to the highest temperature possible $133 $1,175
UU0271 #01 Y:2025 Moderate cooling tower outlet temperature $3,038 $1,248
UL2504 #03 Y:2025 Use outside cold water source as a supply of cooling water $10,447 $57,490
IC0326 #08 Y:2025 Utilize a less expensive cooling method $15,398 $114,881
LS0525 #01 Y:2025 Chill water to the highest temperature possible $6,053 $250
UF0629 #05 Y:2025 Minimize condenser cooling water temperature $1,706 $754
UF0629 #03 Y:2025 Replace existing chiller with high efficiency model $14,977 $47,000
MZ1014 #02 Y:2025 Replace existing chiller with high efficiency model $17,333 $125,000
IP0209 #03 Y:2025 Chill water to the highest temperature possible $910 -
MZ0373 #05 Y:2025 Replace existing chiller with high efficiency model $16,241 $120,000
MU0064 #02 Y:2025 Use cooling tower or economizer to replace chiller cooling $25,072 $83,850
UF0628 #07 Y:2025 Minimize condenser cooling water temperature $3,937 $18,930
IP0208 #04 Y:2025 Shut off cooling if cold outside air will cool process $1,666 $82
UD1109 #04 Y:2025 Utilize a less expensive cooling method $41,149 $75,000
AS0605 #01 Y:2025 Utilize a less expensive cooling method $14,690 $25,500
UU0267 #03 Y:2025 Use cooling tower water instead of refrigeration $6,322 $119,100
UF0627 #05 Y:2025 Use highest temperature for chilling or cold storage $3,491 -
UF0627 #02 Y:2025 Replace existing chiller with high efficiency model $16,402 $72,000