2,263
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0472 #01 Y:2026 | 01 | 2026 | Moderate cooling tower outlet temperature | $1,553 | $248 |
n/a
|
| LE0615 #08 Y:2026 | 08 | 2026 | Replace existing chiller with high efficiency model | $6,592 | $22,000 |
n/a
|
| UL2607 #08 Y:2026 | 08 | 2026 | Use outside cold water source as a supply of cooling water | $96,011 | $58,367 |
n/a
|
| LT8448 #01 Y:2026 | 01 | 2026 | Modify refrigeration system to operate at a lower pressure | $59,448 | $219,165 |
n/a
|
| LE0612 #04 Y:2026 | 04 | 2026 | Replace existing chiller with high efficiency model | $355,576 | $250,000 |
n/a
|
| MZ0397 #05 Y:2026 | 05 | 2026 | Replace existing chiller with high efficiency model | $88,780 | $279,688 |
n/a
|
| UF0649 #06 Y:2026 | 06 | 2026 | Minimize condenser cooling water temperature | $2,060 | $1,508 |
n/a
|
| LS0626 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $10,589 | $500 |
n/a
|
| SD0690 #01 Y:2026 | 01 | 2026 | Use cascade system of recirculating during cold weather to avoid sub-cooling | $16,696 | $2,250 |
n/a
|
| LS0526 #05 Y:2026 | 05 | 2026 | Replace existing chiller with high efficiency model | $31,399 | $70,000 |
n/a
|
| LS0526 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $27,684 | $500 |
n/a
|
| MZ0395 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $25,270 | - |
n/a
|
| SD0688 #14 Y:2026 | 14 | 2026 | Use cascade system of recirculating during cold weather to avoid sub-cooling | $18,033 | $2,250 |
n/a
|
| SD0687 #01 Y:2026 | 01 | 2026 | Replace existing chiller with high efficiency model | $3,112 | $3,000 |
n/a
|
| MS0470 #07 Y:2026 | 07 | 2026 | Chill water to the highest temperature possible | $126 | - |
n/a
|
| UL2605 #06 Y:2026 | 06 | 2026 | Use outside cold water source as a supply of cooling water | $236,979 | $474,400 |
n/a
|
| UU0301 #01 Y:2026 | 01 | 2026 | Chill water to the highest temperature possible | $87,700 | $282,000 |
n/a
|
| UC2603 #04 Y:2026 | 04 | 2026 | Use cooling tower or economizer to replace chiller cooling | $7,848 | $15,200 |
n/a
|
| UF0645 #04 Y:2026 | 04 | 2026 | Minimize condenser cooling water temperature | $4,516 | $6,528 |
n/a
|
| GT1006 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $6,481 | $1,200 |
n/a
|