ITAC Assessment: UD1122
ITAC logo
ITAC Assessment: UD1122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Education
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 120
Plant Area 99,875
ft2
Annual Production 1
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,656 1,086,979
kWh
LPG $59,116 4,325
MMBtu
Waste Disposal Costs
Water Usage $8,990 750
Tgal
TOTAL YEARLY COSTS $199,762
RECOMMENDED SAVINGS* $144,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7234: Use heat pump for space conditioning $46,945 $400,000 $(-19,757.0)
(-163,115)
kWh
$66,702
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $534 $4,000 $534
4,406
kWh
-
03 2.2441: Preheat boiler makeup water with waste process heat $1,430 $7,500 - $1,430
-
MMBtu
04 2.2628: Utilize a less expensive cooling method $124 $300 $124
1,024
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $2,853 $25,000 $(-1,196.0)
(-9,871)
kWh
$4,049
-
MMBtu
06 2.9114: Use solar heat to make electricty $92,949 $900,000 $92,949
767,401
kWh
-
TOTAL RECOMMENDED $144,835 $1,336,800 $72,654
599,845
kWh
$72,181
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs