ITAC Assessment: LS0825
ITAC logo
ITAC Assessment: LS0825
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Elementary School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 35
Plant Area 92,025
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,392 1,531,000
kWh
Electricity Demand $14,548 3,531
kW-mo/yr
TOTAL YEARLY COSTS $134,940
RECOMMENDED SAVINGS* $33,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2625: Chill water to the highest temperature possible $8,927 $500 $8,927
112,997
kWh
-
02 2.7423: Reduce heat gain by window tinting $11,016 $2,940 $11,016
139,443
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,793 $5,074 $5,475
69,306
kWh
$1,318
-
kW-mo/yr
04 2.7425: Clean or color roof to reduce solar load $6,367 $24,944 $6,367
80,595
kWh
-
TOTAL RECOMMENDED $33,103 $33,458 $31,785
402,341
kWh
$1,318
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs