ITAC Assessment: UL2506
ITAC logo
ITAC Assessment: UL2506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Thermoplastic Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 210,000
ft2
Annual Production 10,660
ton
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,213 15,713,600
kWh
Electricity Demand $654,795 34,997
kW-mo/yr
Electricity Fees $104,024 -
Natural Gas $521,928 252,045
MMBtu
TOTAL YEARLY COSTS $1,721,960
RECOMMENDED SAVINGS* $192,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $77,396 $40,000 - - - $77,396
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,455 $2,940 $4,455
158,539
kWh
- - -
03 2.2692: Use outside cold water source as a supply of cooling water $43,343 $86,469 $22,731
803,796
kWh
$20,612
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $49,775 $25,480 - - $49,775 -
05 2.9114: Use solar heat to make electricty $13,709 $151,700 $6,345
225,990
kWh
$7,364
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,323 $17,116 $3,323
118,330
kWh
- - -
TOTAL RECOMMENDED $192,001 $323,705 $36,854
1,306,655
kWh
$27,976
-
kW-mo/yr
$49,775 $77,396
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs