| Assessment Year | 2025 |
|---|---|
| Principal Product | Electronic connectors |
| NAICS | 334417: Electronic Connector Manufacturing |
| SIC | 3678: Electronic Connectors |
| Sales Range | $50 M to 100M |
| # of Employees | 331 |
| Plant Area |
105,000
ft2
|
| Annual Production | 242,602,598
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $486,999 | 5,784,000 |
kWh
|
$0.084 | |
| Natural Gas | $48,496 | 7,096 |
MMBtu
|
$6.83 | |
| Waste Disposal Costs | |||||
| Water Usage | $15,302 | 3,088 |
Tgal
|
$4.96 | |
| Water Disposal | $16,274 | 3,088 |
Tgal
|
$5.27 | |
| TOTAL YEARLY COSTS | $567,071 | ||||
| RECOMMENDED SAVINGS* | $118,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $4,145 | $1,560 |
$4,145
49,345
kWh
|
- | |
| 02 | 2.4235: Remove or close off unneeded compressed air lines | $916 | $365 |
$916
10,509
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $7,548 | $54,000 |
$7,548
89,856
kWh
|
- | |
| 04 | 2.2622: Replace existing chiller with high efficiency model | $2,889 | $18,327 |
$2,889
34,400
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,296 | $7,200 |
$8,296
98,530
kWh
|
- | |
| 06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $4,289 | $14,380 | - |
$4,289
-
MMBtu
|
|
| 07 | 2.9114: Use solar heat to make electricty | $86,491 | $702,000 |
$86,491
1,029,649
kWh
|
- | |
| 08 | 2.7314: Reduce ventilation air | $3,456 | $6,974 |
$3,456
41,151
kWh
|
- | |
| TOTAL RECOMMENDED | $118,030 | $804,806 |
$113,741
1,353,440
kWh
|
$4,289
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs