Assessment Year | 2025 |
---|---|
Principal Product | Electronic connectors |
NAICS | 334417: Electronic Connector Manufacturing |
SIC | 3678: Electronic Connectors |
Sales Range | $50 M to 100M |
# of Employees | 331 |
Plant Area |
105,000
ft2
|
Annual Production | 242,602,598
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $486,999 | 5,784,000 |
kWh
|
$0.084 | |
Natural Gas | $48,496 | 7,096 |
MMBtu
|
$6.83 | |
Waste Disposal Costs | |||||
Water Usage | $15,302 | 3,088 |
Tgal
|
$4.96 | |
Water Disposal | $16,274 | 3,088 |
Tgal
|
$5.27 | |
TOTAL YEARLY COSTS | $567,071 | ||||
RECOMMENDED SAVINGS* | $118,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $4,145 | $1,560 |
$4,145
49,345
kWh
|
- | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $916 | $365 |
$916
10,509
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $7,548 | $54,000 |
$7,548
89,856
kWh
|
- | |
04 | 2.2622: Replace existing chiller with high efficiency model | $2,889 | $18,327 |
$2,889
34,400
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,296 | $7,200 |
$8,296
98,530
kWh
|
- | |
06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $4,289 | $14,380 | - |
$4,289
-
MMBtu
|
|
07 | 2.9114: Use solar heat to make electricty | $86,491 | $702,000 |
$86,491
1,029,649
kWh
|
- | |
08 | 2.7314: Reduce ventilation air | $3,456 | $6,974 |
$3,456
41,151
kWh
|
- | |
TOTAL RECOMMENDED | $118,030 | $804,806 |
$113,741
1,353,440
kWh
|
$4,289
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs