Assessment Year | 2025 |
---|---|
Principal Product | Feminine wash & cloths, Glycerin suppositories |
NAICS | 325212: Synthetic Rubber Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
310,000
ft2
|
Annual Production | 5,500,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,020,682 | 10,853,400 |
kWh
|
$0.094 | |
Electricity Demand | $247,494 | 32,142 |
kW-mo/yr
|
$7.70 | |
Electricity Fees | $36,752 | - |
|
- | |
Natural Gas | $140,157 | 46,564 |
MMBtu
|
$3.01 | |
Waste Disposal Costs | |||||
Water Usage | $112,337 | 25,531,267 |
Tgal
|
$0.004 | |
Water Disposal | $283,399 | 25,531,267 |
Tgal
|
$0.011 | |
TOTAL YEARLY COSTS | $1,840,821 | ||||
RECOMMENDED SAVINGS* | $281,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $98,686 | $61,240 |
$84,495
898,888
kWh
|
$14,191
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 3.4151: Minimize water usage | $71,374 | $60,060 |
$(-2,524.0)
(-26,856)
kWh
|
$(-347.0)
-
kW-mo/yr
|
- |
$21,076
-
Tgal
|
$53,169
-
Tgal
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,561 | $12,599 |
$15,558
165,514
kWh
|
$3,003
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4157: Establish a predictive maintenance program | $17,883 | $6,000 |
$20,652
219,704
kWh
|
$2,818
-
kW-mo/yr
|
- | - | - | $(-5,587.0) | - | |
05 | 2.2511: Insulate bare equipment | $17,044 | $488 |
$16,828
179,023
kWh
|
$216
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $13,054 | $14,058 |
$10,913
116,095
kWh
|
$2,141
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.2625: Chill water to the highest temperature possible | $7,508 | $5,220 |
$6,723
71,526
kWh
|
$785
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.1221: Replace obsolete burners with more efficient ones | $7,131 | $13,250 | - | - |
$7,131
-
MMBtu
|
- | - | - | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,955 | $3,160 | - | - |
$6,955
-
MMBtu
|
- | - | - | - | |
10 | 2.4151: Develop a repair/replace policy | $5,033 | $8,967 |
$4,955
52,711
kWh
|
$678
-
kW-mo/yr
|
- | - | - | - | $(-600.0) | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,702 | $378 |
$4,140
44,044
kWh
|
$562
-
kW-mo/yr
|
- | - | - | - | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $4,346 | $11,060 |
$3,633
38,645
kWh
|
$493
-
kW-mo/yr
|
$220
-
MMBtu
|
- | - | - | - | |
13 | 2.4224: Upgrade controls on compressors | $4,273 | $13,665 |
$3,626
38,575
kWh
|
$647
-
kW-mo/yr
|
- | - | - | - | - | |
14 | 2.4239: Eliminate or reduce compressed air usage | $3,661 | $900 |
$3,222
34,281
kWh
|
$439
-
kW-mo/yr
|
- | - | - | - | - | |
15 | 2.4239: Eliminate or reduce compressed air usage | $1,069 | $1,258 |
$938
9,975
kWh
|
$131
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $281,280 | $212,303 |
$173,159
1,842,125
kWh
|
$25,757
-
kW-mo/yr
|
$14,306
-
MMBtu
|
$21,076
-
Tgal
|
$53,169
-
Tgal
|
$(-5,587.0) | $(-600.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs