Assessment Year | 2023 |
---|---|
Principal Product | Fire-Resistant Drywall Panels |
NAICS | 327420: Gypsum Product Manufacturing |
SIC | 3275: Gypsum Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
520,000
ft2
|
Annual Production | 32,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,055,398 | 40,400,459 |
kWh
|
$0.051 |
Electricity Demand | $1,075,576 | 67,306 |
kW-mo/yr
|
$15.98 |
Electricity Fees | $452,474 | - |
|
- |
Natural Gas | $10,023,346 | 1,247,866 |
MMBtu
|
$8.03 |
TOTAL YEARLY COSTS | $13,606,794 | |||
RECOMMENDED SAVINGS* | $11,557,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,698,796 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $9,858,540 | - | - | - | - | - | $9,858,540 | - | - | |
02 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,202,647 | $3,920,000 |
$1,734,000
34,000,000
kWh
|
$767,040
-
kW-mo/yr
|
$(-1,810,305.0)
-
MMBtu
|
- | $511,912 | - | - | |
03 | 2.1113: Reduce combustion air flow to optimum | $280,640 | $30,000 | - | - |
$280,640
-
MMBtu
|
- | - | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $32,141 | $49,680 |
$(-1,043.0)
(-20,442)
kWh
|
$(-2,692.0)
-
kW-mo/yr
|
- | - | $35,876 | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,983 | - |
$12,798
250,942
kWh
|
- | - | $88 | - | $97 | - | |
06 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $74,558 | - | - | - | - | - | $74,558 | - | - | |
07 | 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $61,813 | $29,295 |
$61,813
1,212,014
kWh
|
- | - | - | - | - | - | |
08 | 4.424: Improve space comfort conditioning | $34,014 | $3,179 |
$(-520.0)
(-10,192)
kWh
|
$(-1,342.0)
-
kW-mo/yr
|
- | - | - | - | $35,876 | |
TOTAL RECOMMENDED | $11,557,336 | $4,032,154 |
$1,807,048
35,432,322
kWh
|
$763,006
-
kW-mo/yr
|
$(-1,529,665.0)
-
MMBtu
|
$88 | $10,480,886 | $97 | $35,876 | ||
TOTAL IMPLEMENTED | $1,698,796 | $4,032,154 |
$1,807,048
35,432,322
kWh
|
$763,006
-
kW-mo/yr
|
$(-1,529,665.0)
-
MMBtu
|
$88 | $622,346 | $97 | $35,876 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs