ITAC Assessment: UW0046
ITAC logo
ITAC Assessment: UW0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Boxes
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $1
M
to 5
M
# of Employees 130
Plant Area 233,000
ft2
Annual Production 600
units
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,377 6,397,200
kWh
Natural Gas $431,754 62,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,269 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4239: Eliminate or reduce compressed air usage $44,504 $330 $33,786
422,331
kWh
$10,718
-
kW-mo/yr
- -
02 2.1224: Replace boiler $38,030 $90,000 - - $31,908
-
MMBtu
$6,122
-
Tgal
03 2.7135: Install occupancy sensors $1,735 $1,160 $1,735
21,685
kWh
- - -
TOTAL RECOMMENDED $84,269 $91,490 $35,521
444,016
kWh
$10,718
-
kW-mo/yr
$31,908
-
MMBtu
$6,122
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs